Plus
Langue
Mode d'affichage
19 avril 2026 · 22 min · 4K vues · Scarborough Marina
Crew member polishes hull on scaffolding under bright sun
Ce que couvre cette vidéo
The crew of a Beneteau Oceanis 50 performs extensive hull and mechanical maintenance while the vessel is in a shipyard. Work includes sanding the hull, polishing the topsides, and applying new primer and antifouling paint.▶ 2:19 The owners inspect the hull for osmosis, noting that a previous treatment in 2013 remains effective, though they repair minor blisters with epoxy.▶ 2:50 Maintenance tasks extend to the bow thruster, where the crew removes the propellers to clean the tunnel and inspect the drive pins for corrosion.▶ 4:18 Additionally, the crew rebuilds the high-pressure pump for their ZP watermaker using a service kit, replacing seals and O-rings before installing a new stainless steel motor.▶ 9:28 The team also replaces existing through-hull valves with True Design fittings.▶ 15:35 Regarding the anchor chain, the crew decides to purchase 100 meters of new galvanized chain rather than re-galvanizing the existing, heavily rusted links, as the cost difference is negligible and avoids the structural weakness of a joining link.▶ 18:28
Bateaux dans cette vidéo
Plus de vidéos de Ale & Max - Y2K Sailing Adventure
De Ale & Max - Y2K Sailing Adventure — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.