AMAZING NEWS FROM LAGOON!! - Cracked bulkhead SERIES FINALE (Episode 119)
25 juillet 2021 · 15 min · 252K vues · Linton Bay Marina
Ce que couvre cette vidéo
The crew of the 45-ft catamaran Parlay Revival completes the structural repair of a cracked bulkhead, a project requiring 70 liters of epoxy resin, 100 meters of fiberglass, and approximately $10,000 in materials.13:01 The repair process involved removing interior trim and cabinetry to access the bulkhead, which had bowed significantly due to structural failure.5:13 After glassing the frame back into place, the crew reinstalled the interior panels and trim, noting that the hull alignment returned to a square position.5:14 Following the completion of this work, the manufacturer, Lagoon, announced a global initiative to provide free inspections for Lagoon 450 owners concerned about bulkhead integrity.5:39 Lagoon committed to covering repair costs for boats with standard usage histories, while offering technical assistance for vessels with histories of significant damage or groundings.6:44 The crew plans to monitor the manufacturer's implementation of these repair procedures to ensure they meet professional standards.14:34
Bateaux dans cette vidéo
Plus de vidéos de Sailing Parlay Revival
De Sailing Parlay Revival — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



