Sailing Parlay Revivalvideo

AMAZING NEWS FROM LAGOON!! - Cracked bulkhead SERIES FINALE (Episode 119)

25 July 2021 · 15 min · 252K views · Linton Bay Marina

What this video covers

The crew of the 45-ft catamaran Parlay Revival completes the structural repair of a cracked bulkhead, a project requiring 70 liters of epoxy resin, 100 meters of fiberglass, and approximately $10,000 in materials.13:01 The repair process involved removing interior trim and cabinetry to access the bulkhead, which had bowed significantly due to structural failure.5:13 After glassing the frame back into place, the crew reinstalled the interior panels and trim, noting that the hull alignment returned to a square position.5:14 Following the completion of this work, the manufacturer, Lagoon, announced a global initiative to provide free inspections for Lagoon 450 owners concerned about bulkhead integrity.5:39 Lagoon committed to covering repair costs for boats with standard usage histories, while offering technical assistance for vessels with histories of significant damage or groundings.6:44 The crew plans to monitor the manufacturer's implementation of these repair procedures to ensure they meet professional standards.14:34

Watch on YouTube

Boats in this video

Lagoon 450Their boat

More from Sailing Parlay Revival

Spontaneous trip to Canada to visit a special someone! - (Episode 379)Aug 2026Every Sailor Needs This Lightning Protection System! - Part 2 - (Episode 378)Aug 2026Installing the Ultimate Lightning Protection System! - Part 1 - (Episode 377)Aug 2026From Military Sniper to Sailing Around the World - (Episode 376)Aug 2026

From Sailing Parlay Revival — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue