Sailing Yabávidéo
Installing all STANDING RIGGING and ILLUMINATING where the sun doesn't shine! — Sailing Yabá 196
3 mars 2024 · 21 min · 100K vues · Florianópolis
Ce que couvre cette vidéo
The crew of Yabá, a boat undergoing a major refit in a shipyard, is finalizing the installation of standing rigging and underwater lighting. Professional riggers from Florianopolis are measuring, cutting, and fitting stainless steel shrouds to ensure the mast remains plumb.0:25 The team is reusing existing hardware where possible, swapping shorter wires to different positions to avoid unnecessary coupling pieces.1:30 Simultaneously, the crew is installing Lumitech underwater lights, including four small units and two larger Quattro models at the bow and stern.8:57 These lights feature dual-color white and blue output, toggled by cycling the power switch.9:12 Below the waterline, the hull work is nearing completion, with the side keel extension and plank replacement finished.13:58 Remaining tasks before launch include applying anodes, anti-fouling paint, and prop speed coating to the propeller and light housings.13:22 Once the shipyard completes the final hull repairs, the boat will be moved to a crib for the final underwater preparations before entering the water.14:31
Plus de vidéos de Sailing Yabá
De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



