Sailing Squibvidéo

Sailing Squib - May 2026 /4

1 octobre 2026 · 19 min · 17 vues

Ce que couvre cette vidéo

Refitting the interior and exterior of the boat Squib involves installing a new water heater, mounting outboard motor brackets, and finishing cabin paneling. The owner installs a new water heater by securing it to the existing bulkhead, requiring only minor drilling and plumbing connections.Watch He fabricates and mounts custom brackets for both a gasoline and an electric outboard motor, ensuring clearance for the shower hose hatch.2:13 Interior work includes installing white panels over previously raw wood surfaces and constructing a custom housing for the wind instrument, which requires shortening the data cable and securing the mounting bracket with perforated metal strapping.5:00 To improve mast rake and backstay tension, the owner fabricates two stainless steel plates for the forestay, drilling 10mm holes using cobalt bits and manual cooling techniques.14:31 Additionally, he discovers the rudder has jumped its lower mounting point while the boat is on the hard, likely due to external impact from construction machinery, and plans to use a car jack and wooden block to realign it.18:36

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib - May 2026/3sept. 2026Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème