Sailing Yabávidéo
Risky maneuver at the shipyard shifting huge wooden boats with one winch only — Sailing Yabá #102
9 octobre 2022 · 23 min · 131K vues
Ce que couvre cette vidéo
The shipyard crew shifts the wooden boat Yabá to a new position on land to accommodate a neighbor vessel requiring long-term repairs for teredo worm damage and frame rot.3:36 Workers execute the move using hydraulic jacks, wedges, and temporary supports, shifting the boat incrementally to clear space for other vessels in the yard.1:40 Meanwhile, the refit of Yabá continues with the installation of approximately six tons of ballast, consisting of metal tubes and stones positioned near the centerline to maintain proper trim.21:30 The crew prepares the interior by installing grooved marine plywood wall panels, which they seal with epoxy and paint in an off-white finish.7:25 Additionally, the mast undergoes sanding and preparation for varnishing.16:02 The project remains focused on structural integrity and interior finishing while maintaining access to bilge pumps, through-hull fittings, and hydraulic systems.22:26
Plus de vidéos de Sailing Yabá
De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



