Sven Yrvindvidéo

Mattress and Drawing Board Installed.

27 août 2026 · 5 min · 12K vues

Ce que couvre cette vidéo

Sven Yrvind installs a mattress and a drawing board inside his high-latitude boat.1:35 The mattress, which initially appeared too large for the cabin, fits into the sleeping area with sufficient length for his feet but limited width on the sides.2:19 He notes the need for better side clearance in future boat designs.2:30 The installation process creates significant dust within the confined space.2:04 He also mounts a drawing board and organizes power banks and old iPhones for use during his upcoming voyage.0:56 He secures hose clamps using a standard socket tool, noting that while flexible tools exist, a rigid socket is more reliable in a marine environment.4:07 He continues to source additional equipment, including 7 mm fittings for water systems and extra oars.0:14

Regarder sur YouTube

Plus de vidéos de Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.oct. 2026Nervously Cutting the Divinycell Sheets.oct. 2026Trying to Get the Sheerline Right.oct. 2026More molds up.oct. 2026

De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème