Flight Level Zerovidéo

Getting her ready to ship

16 juin 2025 · 26 min · 4K vues

Ce que couvre cette vidéo

The crew of the Beneteau 57 *Vanishing Point* prepares the vessel for shipping from Brisbane, Australia, to the United States by securing deck gear and performing plumbing maintenance.Watch Because the electric davit winch is inoperable, the crew manually lowers the tender into the water using lines, removes the 20-horsepower outboard motor, and mounts the engine on the stern rail.1:05 They then hoist the tender onto the foredeck, securing it upside down over the removed headsail.6:22 To address a leaking manual toilet, the host replaces the joker valve and seals, emphasizing the need to protect the pump rod from scratches during reassembly to ensure a proper vacuum seal.18:45 The crew also sources parts from Whitworths Marine to complete these repairs.4:21 Once the canvas and cockpit cushions are stowed, the boat will be ready for transport to Mexico for a planned refit, including hull painting, stainless steel polishing, and potential varnishing of the toe rail.24:15

Regarder sur YouTube

Bateaux dans cette vidéo

Beneteau 57Leur bateau

Plus de vidéos de Flight Level Zero

Sailing South to Marina Coral, Ensenada, Mexico!sept. 2026Foreign Flag Registration and Cruising Licenses: What Sailors Need to Knowsept. 2026Catalina Sailing: Our Last Stop Before Mexicosept. 2026Let’s get this Boat Ready for Mexico | Project Weeksept. 2026

De Flight Level Zero — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème