Sailing Umavidéo
Forced to spend my first night onboard. | Step 433
23 mars 2025 · 33 min · 126K vues
Ce que couvre cette vidéo
Kika performs structural fiberglass repairs in the cockpit locker of the 40-foot steel sailboat *Uma* while solo at a boatyard.2:26 The project involves glassing in the bulkhead and pilot berth to prepare the space for future systems and plumbing installation.2:52 She prepares the surfaces by sanding, grinding, vacuuming, and wiping with acetone.13:58 To ensure proper curing in cold winter temperatures, she uses vinyl ester resin mixed with wax instead of peel ply and employs a portable heater to maintain ambient warmth overnight.19:04 She tears chopped strand mat into pieces for application, noting that this method is more effective than cutting biaxial fabric for this specific task.17:14 After several days of curing, the fiberglass structure is solid and ready for future priming and painting.32:29 The work occurs while the co-owner, Dan, is away skippering a charter event in the British Virgin Islands.1:00
Plus de vidéos de Sailing Uma
De Sailing Uma — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



