Sailing Umavídeo

Forced to spend my first night onboard. | Step 433

23 de março de 2025 · 33 min · 126K visualizações

O que este vídeo aborda

Kika performs structural fiberglass repairs in the cockpit locker of the 40-foot steel sailboat *Uma* while solo at a boatyard.2:26 The project involves glassing in the bulkhead and pilot berth to prepare the space for future systems and plumbing installation.2:52 She prepares the surfaces by sanding, grinding, vacuuming, and wiping with acetone.13:58 To ensure proper curing in cold winter temperatures, she uses vinyl ester resin mixed with wax instead of peel ply and employs a portable heater to maintain ambient warmth overnight.19:04 She tears chopped strand mat into pieces for application, noting that this method is more effective than cutting biaxial fabric for this specific task.17:14 After several days of curing, the fiberglass structure is solid and ready for future priming and painting.32:29 The work occurs while the co-owner, Dan, is away skippering a charter event in the British Virgin Islands.1:00

Assistir no YouTube

Mais de Sailing Uma

Our boat won’t look the same after this | Step 495ago. de 2026The ONE Thing We Disagreed on This Entire Refit | Step 494ago. de 2026We Owe You The Full Storyjul. de 2026We spent $10,000 on something Pretty | Step 493jul. de 2026

De Sailing Uma — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema