Sven Yrvindvidéo

26 Sep 2025 A leek but no worry

25 septembre 2025 · 4 min · 2K vues · Baltic Sea

Ce que couvre cette vidéo

Sven Yrvind performs structural maintenance on his boat while preparing it for launch in the Baltic. He inspects a newly cut and countersunk drainage hole, ensuring the fiberglass work around the bumpkin remains secure.0:03 To test the integrity of the hull fittings, he fills the area with water and monitors for leaks.2:02 A small leak appears between a copper pipe and its through-hull fitting, though the interior remains dry.2:37 He addresses the leak by applying abrasive to the plug, noting that the opposite side of the hull shows no signs of water ingress.2:23 The process emphasizes the importance of addressing minor maintenance tasks immediately upon discovery to ensure overall vessel reliability.

Regarder sur YouTube

Plus de vidéos de Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.oct. 2026Nervously Cutting the Divinycell Sheets.oct. 2026Trying to Get the Sheerline Right.oct. 2026More molds up.oct. 2026

De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème