Catamaran Mistertong vidéo
#50 Complete cabin refit for Loulou….
2 novembre 2024 · 34 min · 5K vues · Le Marin, Martinique
Ce que couvre cette vidéo
The crew of the catamaran Mistertong performs a complete refit of Loulou’s cabin, involving extensive sanding, structural repairs, and painting.0:07 The project requires rounding off edges, filling imperfections, and applying a primer coat to walls, ceilings, and a newly installed shelf. To ensure proper adhesion, the team uses eccentric sanders to prepare surfaces before applying a primer and subsequent white and grey topcoats. The work schedule spans several days, with the crew coordinating tasks to meet a deadline for reassembling the cabin.0:29 Beyond the cabin, the crew addresses minor maintenance in the engine bay and experiments with painting sections of the galley. The project highlights the efficiency of using 2.5-liter paint cans for multiple interior areas, including the stairs and companionway. While the refit progresses, the crew manages daily life at anchor, including laundry logistics and the challenges of operating the dinghy. The cabin renovation demonstrates that thorough surface preparation and finishing work significantly extend project timelines but result in a cleaner, more durable interior finish.
Plus de vidéos de Catamaran Mistertong
De Catamaran Mistertong — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



