Hold Fast!vidéo

S/V SeaSprite Refit Update 9 September 2026

9 septembre 2026 · 1 min · 461 vues

Ce que couvre cette vidéo

A Sea Sprite 30 refit is underway, with Buster Phipps contracted to handle a substantial scope of work including replacing through-hulls, repairing the toe rail, and installing a mid-rail chock scarfed into the toe rail. Lizzie cleared the interior of miscellaneous gear per Phipps's request, staging heavy tubs below and leaving only the propeller shaft and tiller aboard temporarily.0:36 The engine installation is pending, and the shaft was left in place to prevent it going missing during the yard period.0:58 A test fit of two Epoch 300Ah lithium batteries confirmed that 600Ah of capacity now fits in the same space previously occupied by two Group 24 AGMs — a significant gain in energy storage without a footprint increase.1:09

Regarder sur YouTube

Bateaux dans cette vidéo

Cabo RICO 38Leur bateauSea SPRITE 30Leur bateauCabo RICO 56Leur bateau

Plus de vidéos de Hold Fast!

S/V SeaSprite Refit Update 8 September 2026sept. 2026S/V SeaSprite Refit Update - 4 Sep 2026sept. 2026S/V SeaSprite Refit Update - 19 August 2026août 2026The Wreck of the Schooner Mary Louisajuil. 2026

De Hold Fast! — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème