Plan-Seavidéo
45ft. SAILBOAT RESTORATION... The Work Continues | (EP. 019)
20 septembre 2025 · 27 min · 3K vues
Ce que couvre cette vidéo
The crew of the 45-foot sailboat Plan C performs a series of maintenance tasks in a boatyard to prepare for an upcoming passage to the Bahamas. They service mast-mounted winches by disassembling the internal bearings and gears, cleaning them with mineral spirits, and repacking them with grease.6:12 To address a broken boom vang, the crew removes the unit, cleans a rusted internal spring, and replaces the wire rope assembly.9:26 They also install a new diesel fill hose and secure it with tight hose clamps.11:17 The electrical work includes routing solar panel wiring through a cockpit pass-through, crimping connectors, and connecting the array to a 60-amp MPPT solar charge controller with manual disconnect fuses.17:55 When attempting to remove a seized winch from the mast, the crew encounters galvanic corrosion between stainless steel screws and the aluminum housing; they use heat, impact drivers, and eventually cut the housing to remove the hardware.21:18 The crew also installs an 8-foot Shakespeare VHF antenna and adds foam padding to solar panel corners to prevent injury.25:27
Plus de vidéos de Plan-Sea
De Plan-Sea — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



