The Lazy Geckos ™ vidéo

The Captain Put Her to Work - The Lazy Geckos Ep. 364

17 septembre 2026 · 8 min · 28K vues

Ce que couvre cette vidéo

Jeremiah replaces the raw water pump on the port engine of Calypso to resolve a persistent leak that caused corrosion.3:30 The repair requires removing the engine hoses and extracting the pump gear using a specialized puller tool.3:40 Because the engine access is located in the galley, the maintenance disrupts daily living routines in the aft cabin and kitchen.1:26 Jeremiah, a former F-18 engine and fuel systems mechanic, emphasizes the importance of physically touching every component during a post-repair inspection to ensure all connections are tight and secure.7:19 After the installation, the crew confirms the engine cooling system is functioning by verifying water flow from the exhaust.6:33 The project concludes with the boat departing the dock for a new anchorage.7:52

Regarder sur YouTube

Plus de vidéos de The Lazy Geckos ™

Trying to Motivate The Captain! - The Lazy Geckos Ep. 363sept. 2026Downwind Sailing Never Looked This Good!- - The Lazy Geckos Ep. 362sept. 2026A Rare Moment We Never Expected To See! - The Lazy Geckos Ep. 361août 2026This Might Be Our New Favorite Tradition - The Lazy Geckos Ep. 360août 2026

De The Lazy Geckos ™ — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème