The Lazy Geckos ™ vídeo
The Captain Put Her to Work - The Lazy Geckos Ep. 364
17 de setembro de 2026 · 8 min · 28K visualizações
O que este vídeo aborda
Jeremiah replaces the raw water pump on the port engine of Calypso to resolve a persistent leak that caused corrosion.3:30 The repair requires removing the engine hoses and extracting the pump gear using a specialized puller tool.3:40 Because the engine access is located in the galley, the maintenance disrupts daily living routines in the aft cabin and kitchen.1:26 Jeremiah, a former F-18 engine and fuel systems mechanic, emphasizes the importance of physically touching every component during a post-repair inspection to ensure all connections are tight and secure.7:19 After the installation, the crew confirms the engine cooling system is functioning by verifying water flow from the exhaust.6:33 The project concludes with the boat departing the dock for a new anchorage.7:52
Mais de The Lazy Geckos ™
De The Lazy Geckos ™ — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



