BoatworksTodayvidéo
Mounting And Fairing The Aft Deck Bracing For My Bertram 25 Conversion
29 juin 2025 · 18 min · 12K vues
Ce que couvre cette vidéo
Andy performs structural modifications to the aft deck of a Bertram 25, focusing on mounting and fairing bracing components.▶ 0:00 He begins by tapering the edges of the deck bracing to prepare for future fiberglass tabbing and structural integration.▶ 0:00 To create a clean radius for the transition, he uses a temporary backer, allowing the epoxy to set overnight before proceeding with shaping.▶ 4:14 He constructs a custom sanding block from scrap lumber to match the specific curvature of the deck troughs, ensuring uniform material removal.▶ 7:07 After scuffing all glossy surfaces to ensure proper adhesion, he fabricates a custom-shaped trowel to apply fairing compound, which he then levels using a longboard to maintain consistent geometry.▶ 11:26 He verifies the drainage of the finished surface by testing the water runoff toward the port and starboard scuppers.▶ 17:01 The process emphasizes the utility of shop-made tools for achieving precise fairing in tight, non-standard spaces.▶ 11:11
Plus de vidéos de BoatworksToday
De BoatworksToday — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



