Acorn To Arabellavideo
Finishing the Port Side Planking - Episode 170 - Acorn to Arabella: Journey of a Wooden Boat
9 luglio 2021 · 25 min · 121K visualizzazioni · Massachusetts
Cosa tratta questo video
Construction of the wooden boat *Arabella* continues with the installation of the final plank on the port side and the development of the deckhouse structure.0:22 The crew uses cedar strips to laminate the house sides, employing an epoxy-based construction method that will be fiberglassed for structural stability.2:17 To accommodate the dinghy on the roof while maintaining interior headroom, the team adjusts the house height and camber, using a mock-up to verify clearances.1:10 The sill plate design incorporates a cove to facilitate future caulking of the deck-to-house seam.4:15 While the port side hull planking is nearly complete, the crew intentionally leaves the final sheer strakes off to maintain access to the staging and to avoid premature caulking.21:39 By delaying the final hull closure and caulking until just before launch, the builders prevent the wood from undergoing multiple seasonal swelling and shrinking cycles, which would otherwise loosen the cotton caulking.22:02
Altro da Acorn To Arabella
Da Acorn To Arabella — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



