Acorn To Arabellavídeo

Finishing the Port Side Planking - Episode 170 - Acorn to Arabella: Journey of a Wooden Boat

9 de julho de 2021 · 25 min · 121K visualizações · Massachusetts

O que este vídeo aborda

Construction of the wooden boat *Arabella* continues with the installation of the final plank on the port side and the development of the deckhouse structure.0:22 The crew uses cedar strips to laminate the house sides, employing an epoxy-based construction method that will be fiberglassed for structural stability.2:17 To accommodate the dinghy on the roof while maintaining interior headroom, the team adjusts the house height and camber, using a mock-up to verify clearances.1:10 The sill plate design incorporates a cove to facilitate future caulking of the deck-to-house seam.4:15 While the port side hull planking is nearly complete, the crew intentionally leaves the final sheer strakes off to maintain access to the staging and to avoid premature caulking.21:39 By delaying the final hull closure and caulking until just before launch, the builders prevent the wood from undergoing multiple seasonal swelling and shrinking cycles, which would otherwise loosen the cotton caulking.22:02

Ver no YouTube

Mais de Acorn To Arabella

Upgrading the Rudder and Another Trek To The Cliff08/2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coast07/2026Exploring Newfoundland's Unclimbed Coastal Cliffs by Sailboat07/2026Fjord Hopping | Arabella Sails East Toward The Nuddick07/2026

De Acorn To Arabella — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema