Acorn To Arabellavidéo

Finishing the Port Side Planking - Episode 170 - Acorn to Arabella: Journey of a Wooden Boat

9 juillet 2021 · 25 min · 121K vues · Massachusetts

Ce que couvre cette vidéo

Construction of the wooden boat *Arabella* continues with the installation of the final plank on the port side and the development of the deckhouse structure.0:22 The crew uses cedar strips to laminate the house sides, employing an epoxy-based construction method that will be fiberglassed for structural stability.2:17 To accommodate the dinghy on the roof while maintaining interior headroom, the team adjusts the house height and camber, using a mock-up to verify clearances.1:10 The sill plate design incorporates a cove to facilitate future caulking of the deck-to-house seam.4:15 While the port side hull planking is nearly complete, the crew intentionally leaves the final sheer strakes off to maintain access to the staging and to avoid premature caulking.21:39 By delaying the final hull closure and caulking until just before launch, the builders prevent the wood from undergoing multiple seasonal swelling and shrinking cycles, which would otherwise loosen the cotton caulking.22:02

Regarder sur YouTube

Plus de vidéos de Acorn To Arabella

Upgrading the Rudder and Another Trek To The Cliffaoût 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjuil. 2026Exploring Newfoundland's Unclimbed Coastal Cliffs by Sailboatjuil. 2026Fjord Hopping | Arabella Sails East Toward The Nuddickjuil. 2026

De Acorn To Arabella — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème