Acorn To Arabellavidéo
Finishing the Port Side Planking - Episode 170 - Acorn to Arabella: Journey of a Wooden Boat
9 juillet 2021 · 25 min · 121K vues · Massachusetts
Ce que couvre cette vidéo
Construction of the wooden boat *Arabella* continues with the installation of the final plank on the port side and the development of the deckhouse structure.0:22 The crew uses cedar strips to laminate the house sides, employing an epoxy-based construction method that will be fiberglassed for structural stability.2:17 To accommodate the dinghy on the roof while maintaining interior headroom, the team adjusts the house height and camber, using a mock-up to verify clearances.1:10 The sill plate design incorporates a cove to facilitate future caulking of the deck-to-house seam.4:15 While the port side hull planking is nearly complete, the crew intentionally leaves the final sheer strakes off to maintain access to the staging and to avoid premature caulking.21:39 By delaying the final hull closure and caulking until just before launch, the builders prevent the wood from undergoing multiple seasonal swelling and shrinking cycles, which would otherwise loosen the cotton caulking.22:02
Plus de vidéos de Acorn To Arabella
De Acorn To Arabella — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



