Sailing Squibvideo

Squib's Refit - Templates for the cockpit - Sanding and filling the deck - Rub rails - Guard rail /85

19 settembre 2024 · 20 min · 923 visualizzazioni

Cosa tratta questo video

Refitting the 38-ft boat *Squib* involves extensive deck preparation, hull repairs, and custom woodwork ahead of a planned departure in six weeks. Peter and Sabina focus on sanding and fairing the foredeck and side decks to prepare for painting, while also addressing structural gaps in custom-built wooden rub rails. To seal these gaps, Peter injects a mixture of sawdust and low-viscosity epoxy, repeating the process multiple times to ensure complete saturation before sanding the surfaces flush. The crew also removes hardware, including railing stanchions, to facilitate sanding; in one instance, Peter extracts a stubborn bolt by applying upward pressure with screwdrivers to counter a spinning, inaccessible backing nut. Additionally, the team creates templates for new cockpit flooring using plastic sheeting and prepares a tablet mount for navigation using the Navionics app. Despite temperatures exceeding 30 degrees Celsius, the project continues with hull patching and final surface preparation for priming and painting.

Guarda su YouTube

Altro da Sailing Squib

Sailing Squib - May 2026/3set 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnesslug 2026Sailing Squib - May 2026 /1lug 2026

Da Sailing Squib — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema