Sailing Squibvidéo
Squib's Refit - Templates for the cockpit - Sanding and filling the deck - Rub rails - Guard rail /85
19 septembre 2024 · 20 min · 922 vues
Ce que couvre cette vidéo
Refitting the 38-ft boat *Squib* involves extensive deck preparation, hull repairs, and custom woodwork ahead of a planned departure in six weeks. Peter and Sabina focus on sanding and fairing the foredeck and side decks to prepare for painting, while also addressing structural gaps in custom-built wooden rub rails. To seal these gaps, Peter injects a mixture of sawdust and low-viscosity epoxy, repeating the process multiple times to ensure complete saturation before sanding the surfaces flush. The crew also removes hardware, including railing stanchions, to facilitate sanding; in one instance, Peter extracts a stubborn bolt by applying upward pressure with screwdrivers to counter a spinning, inaccessible backing nut. Additionally, the team creates templates for new cockpit flooring using plastic sheeting and prepares a tablet mount for navigation using the Navionics app. Despite temperatures exceeding 30 degrees Celsius, the project continues with hull patching and final surface preparation for priming and painting.
Plus de vidéos de Sailing Squib
De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



