Sailing Yabávideo
Transforming Yabá’s Interior for Christmas — Sailing Yabá 236
5 dicembre 2024 · 14 min · 42K visualizzazioni
Cosa tratta questo video
Ben and MP renovate the interior of Yabá, focusing on bathroom bulkhead installation and framing for a decorative wall feature. Ben coats marine-grade copaiba plywood panels with epoxy resin to prevent rot, applying two coats to the back and one to the front before installation.2:47 MP paints the corridor bulkheads to provide a finished surface behind the new structures.6:26 Ben constructs a wooden frame for a canvas wall hanging using a miter jig and corner blocks to avoid drilling through the frame face.10:26 The project stalls when the crew fails to locate a staple gun required to mount the canvas.12:30 Additionally, Ben removes a salt-damaged lithium-ion battery from the boat for proper disposal after it fails following water exposure.4:11 The crew plans to install the pre-fabricated shower box components in the following days.13:47
Altro da Sailing Yabá
Da Sailing Yabá — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



