Sailing Yabávideo

Transforming Yabá’s Interior for Christmas — Sailing Yabá 236

December 5, 2024 · 14 min · 42K views

What this video covers

Ben and MP renovate the interior of Yabá, focusing on bathroom bulkhead installation and framing for a decorative wall feature. Ben coats marine-grade copaiba plywood panels with epoxy resin to prevent rot, applying two coats to the back and one to the front before installation.2:47 MP paints the corridor bulkheads to provide a finished surface behind the new structures.6:26 Ben constructs a wooden frame for a canvas wall hanging using a miter jig and corner blocks to avoid drilling through the frame face.10:26 The project stalls when the crew fails to locate a staple gun required to mount the canvas.12:30 Additionally, Ben removes a salt-damaged lithium-ion battery from the boat for proper disposal after it fails following water exposure.4:11 The crew plans to install the pre-fabricated shower box components in the following days.13:47

Watch on YouTube

More from Sailing Yabá

Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSep 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing YabáSep 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing YabáAug 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing YabáAug 2026

From Sailing Yabá — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue