Sailing Yabávidéo

Transforming Yabá’s Interior for Christmas — Sailing Yabá 236

5 décembre 2024 · 14 min · 42K vues

Ce que couvre cette vidéo

Ben and MP renovate the interior of Yabá, focusing on bathroom bulkhead installation and framing for a decorative wall feature. Ben coats marine-grade copaiba plywood panels with epoxy resin to prevent rot, applying two coats to the back and one to the front before installation.2:47 MP paints the corridor bulkheads to provide a finished surface behind the new structures.6:26 Ben constructs a wooden frame for a canvas wall hanging using a miter jig and corner blocks to avoid drilling through the frame face.10:26 The project stalls when the crew fails to locate a staple gun required to mount the canvas.12:30 Additionally, Ben removes a salt-damaged lithium-ion battery from the boat for proper disposal after it fails following water exposure.4:11 The crew plans to install the pre-fabricated shower box components in the following days.13:47

Regarder sur YouTube

Plus de vidéos de Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásept. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásept. 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásept. 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaoût 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème