Entre Terras e Maresvideo

SOFREMOS para COLAR o acabamento das PAREDES DOO BOX T1.ep 175

19 aprile 2026 · 12 min · 252 visualizzazioni

Cosa tratta questo video

Edgar and Sâmia install white fiberglass wall panels inside the cramped shower stall of their boat.0:01 Because the panels are larger than the available space, Edgar manually files the edges to achieve a precise fit before applying adhesive.0:04 The team uses wooden shims to hold the panels in place while the glue cures for 24 hours.4:46 During the process, a large section of fiberglass sheet was ruined due to an improper gelcoat mixture; adding excessive monomer to old gelcoat caused a "crocodile skin" reaction, rendering the material unusable for the shower walls.9:33 Beyond the bathroom project, Edgar is redesigning the steering wheel hub to accommodate a hydraulic pump that differs from the original Project Sailing specifications.9:24 The team also began disassembling and re-gluing the navigation table structure to refine its finish.11:01

Guarda su YouTube

Altro da Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183lug 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182giu 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181giu 2026This week the focus was on something elsegiu 2026

Da Entre Terras e Mares — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema