Entre Terras e Maresvídeo

SOFREMOS para COLAR o acabamento das PAREDES DOO BOX T1.ep 175

19 de abril de 2026 · 12 min · 252 visualizações

O que este vídeo aborda

Edgar and Sâmia install white fiberglass wall panels inside the cramped shower stall of their boat.0:01 Because the panels are larger than the available space, Edgar manually files the edges to achieve a precise fit before applying adhesive.0:04 The team uses wooden shims to hold the panels in place while the glue cures for 24 hours.4:46 During the process, a large section of fiberglass sheet was ruined due to an improper gelcoat mixture; adding excessive monomer to old gelcoat caused a "crocodile skin" reaction, rendering the material unusable for the shower walls.9:33 Beyond the bathroom project, Edgar is redesigning the steering wheel hub to accommodate a hydraulic pump that differs from the original Project Sailing specifications.9:24 The team also began disassembling and re-gluing the navigation table structure to refine its finish.11:01

Ver no YouTube

Mais de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 18307/2026WE FINISHED the bow cabin LAMINATE ! S1.ep18206/2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 18106/2026This week the focus was on something else06/2026

De Entre Terras e Mares — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema