Entre Terras e Maresvideo

WE FINISHED the bow cabin LAMINATE ! S1.ep182

28 giugno 2026 · 21 min · 354 visualizzazioni

Cosa tratta questo video

Edgar and Sâmia completed the laminate interior finishing in the bow cabin of their boat, transitioning from dark surfaces to a lighter aesthetic.4:26 The project involved cutting and bonding laminate sheets to cabin walls, storage doors, and the navigation station.2:30 To maximize interior brightness, the crew used beige laminate for non-visible storage areas and the base of the bed frame.9:33 They applied edge banding to exposed sections and installed hardware, including door handles, USB ports, and lighting fixtures.8:15 The team utilized a flame-retardant, aluminum-backed insulation material called "protelhado" to line the ceiling and provide thermal protection.17:26 Future plans for the cabin include installing a reflective, mirror-like laminate sheet inside a small vanity table and adding three internal shelves to a storage locker.18:00 The cabin renovation remains ongoing, with the floor and ceiling panels still requiring final installation.18:59

Guarda su YouTube

Altro da Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183lug 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181giu 2026This week the focus was on something elsegiu 2026WE DID IT! WE FINISHED THE CAPTAIN'S SUITE SINK! S1.ep180mag 2026

Da Entre Terras e Mares — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema