SV Rusty Junkvideo

Steel Sailboat Build Part 39

4 maggio 2020 · 5 min · 9K visualizzazioni

Cosa tratta questo video

The owner of the steel sailboat Rusty Junk submits an application for United States Coast Guard documentation, completing six pages of forms at a total cost of $133.Watch The process requires compliance with 4.6 CFR Part 67 Subpart 1, which mandates that the vessel’s official number be permanently marked on an interior structural member.0:36 Simultaneously, the owner modifies a boat trailer to accommodate the vessel.1:22 This work involves cutting and disassembling existing stanchions and stands, then welding new steel reinforcements to the trailer frame.1:34 To lift the boat safely onto the modified stands, the owner uses an engine hoist rather than a standard jack.3:43 The project includes grinding and welding holes and gashes in the trailer steel, followed by painting the structure.3:07 The owner plans to position the boat on the trailer with the bow facing forward once the custom stand fabrication is complete.3:12

Guarda su YouTube

Altro da SV Rusty Junk

Boat life is not for meset 20252025 Chuckanut Baylug 2025Steel Sailboat Launchago 2024Steel Sailboat Update 2ott 2023

Da SV Rusty Junk — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema