SV Rusty Junkvídeo

Steel Sailboat Build Part 39

4 de maio de 2020 · 5 min · 9K visualizações

O que este vídeo aborda

The owner of the steel sailboat Rusty Junk submits an application for United States Coast Guard documentation, completing six pages of forms at a total cost of $133.Watch The process requires compliance with 4.6 CFR Part 67 Subpart 1, which mandates that the vessel’s official number be permanently marked on an interior structural member.0:36 Simultaneously, the owner modifies a boat trailer to accommodate the vessel.1:22 This work involves cutting and disassembling existing stanchions and stands, then welding new steel reinforcements to the trailer frame.1:34 To lift the boat safely onto the modified stands, the owner uses an engine hoist rather than a standard jack.3:43 The project includes grinding and welding holes and gashes in the trailer steel, followed by painting the structure.3:07 The owner plans to position the boat on the trailer with the bow facing forward once the custom stand fabrication is complete.3:12

Ver no YouTube

Mais de SV Rusty Junk

Boat life is not for me09/20252025 Chuckanut Bay07/2025Steel Sailboat Launch08/2024Steel Sailboat Update 210/2023

De SV Rusty Junk — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema