SV Rusty Junkvídeo

Steel Sailboat Build Part 39

4 de maio de 2020 · 5 min · 9K visualizações

O que este vídeo aborda

The owner of the steel sailboat Rusty Junk submits an application for United States Coast Guard documentation, completing six pages of forms at a total cost of $133.Watch The process requires compliance with 4.6 CFR Part 67 Subpart 1, which mandates that the vessel’s official number be permanently marked on an interior structural member.0:36 Simultaneously, the owner modifies a boat trailer to accommodate the vessel.1:22 This work involves cutting and disassembling existing stanchions and stands, then welding new steel reinforcements to the trailer frame.1:34 To lift the boat safely onto the modified stands, the owner uses an engine hoist rather than a standard jack.3:43 The project includes grinding and welding holes and gashes in the trailer steel, followed by painting the structure.3:07 The owner plans to position the boat on the trailer with the bow facing forward once the custom stand fabrication is complete.3:12

Assistir no YouTube

Mais de SV Rusty Junk

Boat life is not for meset. de 20252025 Chuckanut Bayjul. de 2025Steel Sailboat Launchago. de 2024Steel Sailboat Update 2out. de 2023

De SV Rusty Junk — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema