Sailing Nervous- Starting Over!video

#275 How To Strengthen Rigging

1 agosto 2021 · 5 min · 1K visualizzazioni

Cosa tratta questo video

The crew of Nervous- Starting Over! installs a G10 platform to serve as a foundation for a new baby stay.0:26 They prepare the installation by sanding one side of the G10 plate to ensure proper adhesion and cleaning the surface with alcohol.1:02 To secure the platform against the underside of the deck, they mix a thickened epoxy compound to a consistency significantly thicker than peanut butter.2:17 They refrigerate the epoxy before application to extend the working time to approximately 10 minutes.0:54 The installation process involves pulling the platform into position using wire ties threaded through pre-drilled holes in the deck, which are then tightened against wooden wedges placed above the deck.1:58 C-clamps inserted through a nearby hatch provide additional clamping pressure on the opposite side of the platform.2:36 The crew uses a custom-made tool to maneuver the platform into the tight space before the epoxy sets.3:02 Proper surface preparation and a controlled clamping sequence ensure the structural integrity of the new rigging base.

Guarda su YouTube

Altro da Sailing Nervous- Starting Over!

My Dad and Me — Before Everything Changedset 2026Could I Start Over Here?ago 2026Drunken Sailorago 2026Starting Over at 65 - The Hardest Chaptersago 2026

Da Sailing Nervous- Starting Over! — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema