Sailing Nervous- Starting Over!vidéo

#275 How To Strengthen Rigging

1 août 2021 · 5 min · 1K vues

Ce que couvre cette vidéo

The crew of Nervous- Starting Over! installs a G10 platform to serve as a foundation for a new baby stay.0:26 They prepare the installation by sanding one side of the G10 plate to ensure proper adhesion and cleaning the surface with alcohol.1:02 To secure the platform against the underside of the deck, they mix a thickened epoxy compound to a consistency significantly thicker than peanut butter.2:17 They refrigerate the epoxy before application to extend the working time to approximately 10 minutes.0:54 The installation process involves pulling the platform into position using wire ties threaded through pre-drilled holes in the deck, which are then tightened against wooden wedges placed above the deck.1:58 C-clamps inserted through a nearby hatch provide additional clamping pressure on the opposite side of the platform.2:36 The crew uses a custom-made tool to maneuver the platform into the tight space before the epoxy sets.3:02 Proper surface preparation and a controlled clamping sequence ensure the structural integrity of the new rigging base.

Regarder sur YouTube

Plus de vidéos de Sailing Nervous- Starting Over!

My Dad and Me — Before Everything Changedsept. 2026Could I Start Over Here?août 2026Drunken Sailoraoût 2026Starting Over at 65 - The Hardest Chaptersaoût 2026

De Sailing Nervous- Starting Over! — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème