Sailing Nervous- Starting Over!vídeo

#275 How To Strengthen Rigging

1 de agosto de 2021 · 5 min · 1K visualizações

O que este vídeo aborda

The crew of Nervous- Starting Over! installs a G10 platform to serve as a foundation for a new baby stay.0:26 They prepare the installation by sanding one side of the G10 plate to ensure proper adhesion and cleaning the surface with alcohol.1:02 To secure the platform against the underside of the deck, they mix a thickened epoxy compound to a consistency significantly thicker than peanut butter.2:17 They refrigerate the epoxy before application to extend the working time to approximately 10 minutes.0:54 The installation process involves pulling the platform into position using wire ties threaded through pre-drilled holes in the deck, which are then tightened against wooden wedges placed above the deck.1:58 C-clamps inserted through a nearby hatch provide additional clamping pressure on the opposite side of the platform.2:36 The crew uses a custom-made tool to maneuver the platform into the tight space before the epoxy sets.3:02 Proper surface preparation and a controlled clamping sequence ensure the structural integrity of the new rigging base.

Ver no YouTube

Mais de Sailing Nervous- Starting Over!

Philippine Festival!10/2026My Life in the Philippines: Coffee, Scooters & the Sea10/2026Underwater Symphony | Dauin Beach, Philippines 🐠10/2026A Jungle Waterfall… What Did I Find There?🇵🇭09/2026

De Sailing Nervous- Starting Over! — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema