The Marinervideo

T-2 Days - Getting into Departure Mode

24 marzo 2026 · 17 min · 1K visualizzazioni · Sherbrooke, Nova Scotia

Crew pushes red gear trolley inside boat cabin

Cosa tratta questo video

Preparation for an Atlantic crossing on an Open 60 requires transitioning from boatyard maintenance to operational readiness. The host outlines a final 48-hour checklist to secure the vessel before departing France for the United Kingdom and eventually the United States.13:49 Critical tasks include repairing mast track corrosion with JB Weld, installing a secondary engine water intake, and finalizing the emergency fuel transfer system.6:55 The electrical system is undergoing a conversion from 220V to 110V to improve safety, while the Schenker watermaker remains the primary source for freshwater.12:17 The host is also sourcing specific spares, including alternator belts and filters for the Volvo Penta engine, and securing T-fuses for the battery bank.8:19 Logistics for the Newport Bermuda Race are underway via a WhatsApp group for participants.0:10 The planned route avoids a northern track over the Newfoundland Grand Banks, favoring a more southerly path to allow for continued maintenance and a more manageable pace.14:35 A systematic, task-oriented approach to final repairs and provisioning ensures the vessel remains seaworthy for the upcoming passage.

Guarda su YouTube

Altro da The Mariner

Preparing OSPREY for the Atlantic - Come Take a Look!ott 2026Cruising Under Sail | Eric Hiscock | Hull Form Stabilityott 2026Cruising Under Sail by Eric Hiscock Part 1ott 2026Anchoring Solo With No Engine & Updates on the Crewed Atlantic Voyage Oct 2026 Preparationset 2026

Da The Mariner — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema