The Marinervídeo

T-2 Days - Getting into Departure Mode

24 de março de 2026 · 17 min · 1K visualizações · Sherbrooke, Nova Scotia

Crew pushes red gear trolley inside boat cabin

O que este vídeo aborda

Preparation for an Atlantic crossing on an Open 60 requires transitioning from boatyard maintenance to operational readiness. The host outlines a final 48-hour checklist to secure the vessel before departing France for the United Kingdom and eventually the United States.13:49 Critical tasks include repairing mast track corrosion with JB Weld, installing a secondary engine water intake, and finalizing the emergency fuel transfer system.6:55 The electrical system is undergoing a conversion from 220V to 110V to improve safety, while the Schenker watermaker remains the primary source for freshwater.12:17 The host is also sourcing specific spares, including alternator belts and filters for the Volvo Penta engine, and securing T-fuses for the battery bank.8:19 Logistics for the Newport Bermuda Race are underway via a WhatsApp group for participants.0:10 The planned route avoids a northern track over the Newfoundland Grand Banks, favoring a more southerly path to allow for continued maintenance and a more manageable pace.14:35 A systematic, task-oriented approach to final repairs and provisioning ensures the vessel remains seaworthy for the upcoming passage.

Ver no YouTube

Mais de The Mariner

Sailing to Newport, my Trimaran Project & Notes on Archive Management for L- Matrix AI's07/2026Taking a Look Around the Waterfront in Lunenburg, Nova Scotia06/2026Solo Docking an 80ft Yacht Without Use Of The Auxillary Engine05/2026Introducing Longitudinal AI Systems05/2026

De The Mariner — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema