Mais
Idioma
Modo de exibição
The Marinervídeo
24 de março de 2026 · 17 min · 1K visualizações · Sherbrooke, Nova Scotia
Crew pushes red gear trolley inside boat cabin
O que este vídeo aborda
Preparation for an Atlantic crossing on an Open 60 requires transitioning from boatyard maintenance to operational readiness. The host outlines a final 48-hour checklist to secure the vessel before departing France for the United Kingdom and eventually the United States.▶ 13:49 Critical tasks include repairing mast track corrosion with JB Weld, installing a secondary engine water intake, and finalizing the emergency fuel transfer system.▶ 6:55 The electrical system is undergoing a conversion from 220V to 110V to improve safety, while the Schenker watermaker remains the primary source for freshwater.▶ 12:17 The host is also sourcing specific spares, including alternator belts and filters for the Volvo Penta engine, and securing T-fuses for the battery bank.▶ 8:19 Logistics for the Newport Bermuda Race are underway via a WhatsApp group for participants.▶ 0:10 The planned route avoids a northern track over the Newfoundland Grand Banks, favoring a more southerly path to allow for continued maintenance and a more manageable pace.▶ 14:35 A systematic, task-oriented approach to final repairs and provisioning ensures the vessel remains seaworthy for the upcoming passage.
Mais de The Mariner
De The Mariner — veja o barco, a tripulação e cada vídeo analisado do canal.