Entre Terras e Maresvideo

AFTER HARDSHIPS IN THE RAIN! WE REDID THE BOAT'S ENTRANCE!! S1.ep130

4 agosto 2024 · 12 min · 409 visualizzazioni

Cosa tratta questo video

Edgar and Davi rebuild the companionway entrance on their boat to prevent water ingress.Watch The original flush-mounted, flat hatch design failed during rain, allowing water to leak through the temporary plywood joints and overwhelm the drainage channels.Watch To resolve this, the crew constructs a raised, rounded fiberglass hatch cover designed to shed water into the tracks.0:43 They reinforce the structure by laminating layers of fiberglass mat and fabric over a base of resin and fiber-dust putty.3:54 The team builds up the height of the entrance frame to ensure a watertight seal, incorporating a rail system for the sliding hatch.0:40 After securing the new fiberglass components, they apply a filler of talc and fiber dust to smooth the surface for final sanding and painting.6:30 The modified design successfully integrates with the existing LED lighting tracks and provides a more robust, elevated barrier against the elements.8:39

Guarda su YouTube

Altro da Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183lug 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182giu 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181giu 2026This week the focus was on something elsegiu 2026

Da Entre Terras e Mares — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema