Entre Terras e Maresvidéo

AFTER HARDSHIPS IN THE RAIN! WE REDID THE BOAT'S ENTRANCE!! S1.ep130

4 août 2024 · 12 min · 409 vues

Ce que couvre cette vidéo

Edgar and Davi rebuild the companionway entrance on their boat to prevent water ingress.Watch The original flush-mounted, flat hatch design failed during rain, allowing water to leak through the temporary plywood joints and overwhelm the drainage channels.Watch To resolve this, the crew constructs a raised, rounded fiberglass hatch cover designed to shed water into the tracks.0:43 They reinforce the structure by laminating layers of fiberglass mat and fabric over a base of resin and fiber-dust putty.3:54 The team builds up the height of the entrance frame to ensure a watertight seal, incorporating a rail system for the sliding hatch.0:40 After securing the new fiberglass components, they apply a filler of talc and fiber dust to smooth the surface for final sanding and painting.6:30 The modified design successfully integrates with the existing LED lighting tracks and provides a more robust, elevated barrier against the elements.8:39

Regarder sur YouTube

Plus de vidéos de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183juil. 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182juin 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181juin 2026This week the focus was on something elsejuin 2026

De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème