Sailing Squibvideo

Squib's Refit - Episode 44

7 dicembre 2023 · 17 min · 823 visualizzazioni

Cosa tratta questo video

Peter and Sabina perform structural and mechanical upgrades on their pocket catamaran, *Squib*, focusing on deck sealing and bilge pump installation. To improve watertight integrity, Peter routes data and power cables through two conduits directly into the deckhouse rather than through the deck.1:20 He drills 20 mm holes, fills gaps with thickened epoxy, and reinforces the area with fiberglass matting.1:09 He also seals the hull-to-deck joint with thickened epoxy to prevent water ingress.6:38

For the bilge system, Peter replaces inaccessible centrifugal pumps with self-priming diaphragm pumps.13:32 He mounts these pumps above the bilge to simplify maintenance and prevent clogging.13:51 Because the original pump orientation was incorrect, he disassembles the pump heads, rotates the motors 180 degrees, and reconfigures the flow direction to match the installation site.14:15 He finishes by sanding the cured epoxy and preparing the mounting points for the new pumps.12:30 The project prioritizes functional reliability and long-term maintenance access over cosmetic perfection.

Guarda su YouTube

Altro da Sailing Squib

Sailing Squib - May 26 Part 5 Starting to tailor the cockpit cover, water pump replacement starboard engineott 2026Sailing Squib - May 2026 /4ott 2026Sailing Squib - May 2026/3set 2026Sailing Squib May 2026 /2ago 2026

Da Sailing Squib — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema