Sailing Squibvideo
Squib's Refit - Episode 44
7 December 2023 · 17 min · 823 views
What this video covers
Peter and Sabina perform structural and mechanical upgrades on their pocket catamaran, *Squib*, focusing on deck sealing and bilge pump installation. To improve watertight integrity, Peter routes data and power cables through two conduits directly into the deckhouse rather than through the deck.1:20 He drills 20 mm holes, fills gaps with thickened epoxy, and reinforces the area with fiberglass matting.1:09 He also seals the hull-to-deck joint with thickened epoxy to prevent water ingress.6:38
For the bilge system, Peter replaces inaccessible centrifugal pumps with self-priming diaphragm pumps.13:32 He mounts these pumps above the bilge to simplify maintenance and prevent clogging.13:51 Because the original pump orientation was incorrect, he disassembles the pump heads, rotates the motors 180 degrees, and reconfigures the flow direction to match the installation site.14:15 He finishes by sanding the cured epoxy and preparing the mounting points for the new pumps.12:30 The project prioritizes functional reliability and long-term maintenance access over cosmetic perfection.
More from Sailing Squib
From Sailing Squib — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



