Sailing Squibvidéo

Squib's Refit - Episode 44

7 décembre 2023 · 17 min · 823 vues

Ce que couvre cette vidéo

Peter and Sabina perform structural and mechanical upgrades on their pocket catamaran, *Squib*, focusing on deck sealing and bilge pump installation. To improve watertight integrity, Peter routes data and power cables through two conduits directly into the deckhouse rather than through the deck.1:20 He drills 20 mm holes, fills gaps with thickened epoxy, and reinforces the area with fiberglass matting.1:09 He also seals the hull-to-deck joint with thickened epoxy to prevent water ingress.6:38

For the bilge system, Peter replaces inaccessible centrifugal pumps with self-priming diaphragm pumps.13:32 He mounts these pumps above the bilge to simplify maintenance and prevent clogging.13:51 Because the original pump orientation was incorrect, he disassembles the pump heads, rotates the motors 180 degrees, and reconfigures the flow direction to match the installation site.14:15 He finishes by sanding the cured epoxy and preparing the mounting points for the new pumps.12:30 The project prioritizes functional reliability and long-term maintenance access over cosmetic perfection.

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib - May 26 Part 5 Starting to tailor the cockpit cover, water pump replacement starboard engineoct. 2026Sailing Squib - May 2026 /4oct. 2026Sailing Squib - May 2026/3sept. 2026Sailing Squib May 2026 /2août 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème