Project Brupegvideo
Fitting the Final Skin - Project Brupeg Ep. 137
27 aprile 2020 · 20 min · 33K visualizzazioni
Cosa tratta questo video
Fabrication of the second wing for the expedition boat conversion involves welding steel plating onto structural ribs to create a watertight, aerodynamic foil shape. The process requires precise alignment of the steel skins, which are marked, drilled, and slotted using a one-millimeter cutoff disc to ensure a tight, weldable gap.7:47 Structural arms linking the wings to the hull are constructed by laminating three 50mm by 5mm steel sections to achieve 10mm wall thickness for rigidity.5:21 A new TIG welder is utilized for stainless steel components, while a repurposed stainless steel beer keg serves as a sediment-trapping sump for yard wastewater.0:28 After tacking the skin in place, the crew grinds the ribs and plate edges to bare metal to ensure high-quality welds.15:45 The wings are then fully welded, cleaned with a flapper disc, and prepared for pressure testing and the installation of mounting hinges.19:32 A temporary canvas tarpaulin provides weather protection for the outdoor workspace during rain.14:48
Altro da Project Brupeg
Da Project Brupeg — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



