Project Brupegvídeo

Fitting the Final Skin - Project Brupeg Ep. 137

27 de abril de 2020 · 20 min · 33K visualizações

O que este vídeo aborda

Fabrication of the second wing for the expedition boat conversion involves welding steel plating onto structural ribs to create a watertight, aerodynamic foil shape. The process requires precise alignment of the steel skins, which are marked, drilled, and slotted using a one-millimeter cutoff disc to ensure a tight, weldable gap.7:47 Structural arms linking the wings to the hull are constructed by laminating three 50mm by 5mm steel sections to achieve 10mm wall thickness for rigidity.5:21 A new TIG welder is utilized for stainless steel components, while a repurposed stainless steel beer keg serves as a sediment-trapping sump for yard wastewater.0:28 After tacking the skin in place, the crew grinds the ribs and plate edges to bare metal to ensure high-quality welds.15:45 The wings are then fully welded, cleaned with a flapper disc, and prepared for pressure testing and the installation of mounting hinges.19:32 A temporary canvas tarpaulin provides weather protection for the outdoor workspace during rain.14:48

Ver no YouTube

Mais de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.46310/2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.46209/2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.46109/2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.46009/2026

De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema