Be The Captainvideo
The "Hidden" Problems of a New $2M Yacht (Blue Water 56 Commissioning)
8 giugno 2026 · 24 min · 126K visualizzazioni
Man walks deck of white yacht at marina
Cosa tratta questo video
Commissioning a new Bluewater 56 involves removing protective plastic wrap, lifting the vessel from a shipping cradle via crane, and verifying systems after launch.0:34 The process requires checking the bilge for water ingress and confirming cooling water flow from the engine exhaust immediately upon startup.4:45 A primary technical challenge involves configuring the lithium battery system, which features 2,000 amp-hours at 24 volts and 10,000 watts of inverter capacity.6:53 When the generator initially charged the batteries, the high absorption voltage caused the system to overload and trigger a protective shutdown.7:36 Adjusting the inverter settings to lower the absorption voltage allows the system to ramp up charging gradually, preventing the fail-safe from tripping while running multiple AC units.8:42 The Bluewater 56, designed by Hermann Freyr, shares a hull design with the Swan 53 and features a cutter rig with three-spreader mast and integrated spreader lights.6:06 The vessel includes a cedar-lined interior, four refrigeration units, and a walk-around bed in the master cabin.22:13
Barche in questo video
Altro da Be The Captain
Da Be The Captain — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



