Be The Captainvídeo
The "Hidden" Problems of a New $2M Yacht (Blue Water 56 Commissioning)
8 de junio de 2026 · 24 min · 126K visitas
Man walks deck of white yacht at marina
Qué cubre este vídeo
Commissioning a new Bluewater 56 involves removing protective plastic wrap, lifting the vessel from a shipping cradle via crane, and verifying systems after launch.0:34 The process requires checking the bilge for water ingress and confirming cooling water flow from the engine exhaust immediately upon startup.4:45 A primary technical challenge involves configuring the lithium battery system, which features 2,000 amp-hours at 24 volts and 10,000 watts of inverter capacity.6:53 When the generator initially charged the batteries, the high absorption voltage caused the system to overload and trigger a protective shutdown.7:36 Adjusting the inverter settings to lower the absorption voltage allows the system to ramp up charging gradually, preventing the fail-safe from tripping while running multiple AC units.8:42 The Bluewater 56, designed by Hermann Freyr, shares a hull design with the Swan 53 and features a cutter rig with three-spreader mast and integrated spreader lights.6:06 The vessel includes a cedar-lined interior, four refrigeration units, and a walk-around bed in the master cabin.22:13
Barcos en este vídeo
Más de Be The Captain
De Be The Captain — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.