Project Brupegvideo

Inventing our way out of a problem - Project Brupeg Ep.459

6 settembre 2026 · 17 min · 18K visualizzazioni

Cosa tratta questo video

To mount a winch on the roof of the boat, the crew installs six steel crush tubes into the structural ribs.0:21 Because the overhead drilling requires more force than manual pressure can provide, the owner constructs a lever-based jig that uses a wooden arm to drive a 25mm hole saw through the steel.3:32 When the hole saw’s center pin repeatedly bends, the crew replaces it with the hardened steel shaft of a flathead screwdriver.8:07 To weld the crush tubes into the ribs without damaging the solar panels mounted on the opposite side of the roof, the owner uses a series of small MIG tack welds, cooling the metal with compressed air between each pass to keep the surface temperature below 80 degrees Celsius.12:15 The project also includes replacing a spun-hub propeller on the dinghy’s outboard with a four-blade model to improve low-end acceleration when carrying heavy loads.0:52

Guarda su YouTube

Altro da Project Brupeg

Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461set 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460set 2026Over Engineering a Simple Bracket - Project Brupeg Ep. 458ago 2026How strong to you want this winch mount? Brupeg strong... Project Brupeg Ep.457ago 2026

Da Project Brupeg — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema