Project Brupegvídeo

Inventing our way out of a problem - Project Brupeg Ep.459

6 de setembro de 2026 · 17 min · 18K visualizações

O que este vídeo aborda

To mount a winch on the roof of the boat, the crew installs six steel crush tubes into the structural ribs.0:21 Because the overhead drilling requires more force than manual pressure can provide, the owner constructs a lever-based jig that uses a wooden arm to drive a 25mm hole saw through the steel.3:32 When the hole saw’s center pin repeatedly bends, the crew replaces it with the hardened steel shaft of a flathead screwdriver.8:07 To weld the crush tubes into the ribs without damaging the solar panels mounted on the opposite side of the roof, the owner uses a series of small MIG tack welds, cooling the metal with compressed air between each pass to keep the surface temperature below 80 degrees Celsius.12:15 The project also includes replacing a spun-hub propeller on the dinghy’s outboard with a four-blade model to improve low-end acceleration when carrying heavy loads.0:52

Ver no YouTube

Mais de Project Brupeg

Look, It's possible we should have cleaned this before now... Project Brupeg Ep.46109/2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.46009/2026Over Engineering a Simple Bracket - Project Brupeg Ep. 45808/2026How strong to you want this winch mount? Brupeg strong... Project Brupeg Ep.45708/2026

De Project Brupeg — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema