Project Brupegvideo

Something special happened in the engine room - Project Brupeg Ep.308

18 giugno 2023 · 34 min · 41K visualizzazioni

Cosa tratta questo video

The crew of the 17.37-meter steel vessel Brupeg performs multiple refit tasks, including engine room bulkhead preparation, electrical system upgrades, and the installation of a new induction cooktop.0:09 Damien and the team grind and fair the engine room bulkhead to prepare for a commemorative laser-etched stainless steel plaque dedicated to a supporter, Billy McConnell.3:53 To accommodate the new induction cooktop, Damien modifies the galley cabinetry and polishes the stainless steel surface to a brushed finish.8:59 Meanwhile, guest Philip Duncan installs current-monitoring hardware for the boat’s two inverters, using current clips and a Raspberry Pi Pico board to display power output on the bridge.5:31 Margot installs insulation in the lower cabin, following the original 50-year-old design that maintains a one-inch air gap between the hull and insulation to prevent condensation on the steel.23:03 Damien also prepares to mount a SeaTalk digital compass on the radar mast, positioning it away from the steel structure to ensure accurate navigation data.23:24

Guarda su YouTube

Altro da Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456ago 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455ago 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454lug 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453lug 2026

Da Project Brupeg — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema