Project Brupegvidéo

Something special happened in the engine room - Project Brupeg Ep.308

18 juin 2023 · 34 min · 41K vues

Ce que couvre cette vidéo

The crew of the 17.37-meter steel vessel Brupeg performs multiple refit tasks, including engine room bulkhead preparation, electrical system upgrades, and the installation of a new induction cooktop.0:09 Damien and the team grind and fair the engine room bulkhead to prepare for a commemorative laser-etched stainless steel plaque dedicated to a supporter, Billy McConnell.3:53 To accommodate the new induction cooktop, Damien modifies the galley cabinetry and polishes the stainless steel surface to a brushed finish.8:59 Meanwhile, guest Philip Duncan installs current-monitoring hardware for the boat’s two inverters, using current clips and a Raspberry Pi Pico board to display power output on the bridge.5:31 Margot installs insulation in the lower cabin, following the original 50-year-old design that maintains a one-inch air gap between the hull and insulation to prevent condensation on the steel.23:03 Damien also prepares to mount a SeaTalk digital compass on the radar mast, positioning it away from the steel structure to ensure accurate navigation data.23:24

Regarder sur YouTube

Plus de vidéos de Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456août 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455août 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454juil. 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453juil. 2026

De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème